Smart Coating carries out your waterproofing work in Nador: stop infiltration on flat roofs, facades and foundations.
Around the Marchica lagoon and Nador West Med port, Nador is a rising port and industrial hub, keen on fire protection, pipe lagging and resin floors.
Nador has a Mediterranean coast around the lagoon, humid and windy, salt air. Our teams account for these local constraints to stop infiltration on flat roofs, facades and foundations.

Membranes, resins and liquid systems to suit the substrate.
Against driving rain, moisture and rising damp.
Assessment of infiltration points before work.
Our teams work across Nador — Centre, lagune de Marchica, port de Beni Ensar, Nador West Med (Betoya), zone franche — and nearby towns: Oujda, Berkane.
Our teams come to your site to analyse the substrate and your constraints.
A detailed costed proposal with materials, thicknesses and schedule.
Carried out by trained teams with professional equipment.
Final inspection of the work and handover of documents.
Our teams work across Nador — Centre, lagune de Marchica, port de Beni Ensar, Nador West Med (Betoya), zone franche — and nearby towns: Oujda, Berkane.
We send a costed quote within 48h of the site visit, usually scheduled within a few days in Nador.
Nador has a Mediterranean coast around the lagoon, humid and windy, salt air. In that context, stop infiltration on flat roofs, facades and foundations protects the building and improves its long-term comfort.
Send us your sketch and get your offer within 48h. Our experts respond quickly.